测试账号38

亚洲建材网高级2

收藏

Hot wind circulation oven operation and property confirm

时间:2023-08-22      阅读:125

一、Hot wind circulation oven running confirm


1、Purpose


Trial operation to confirm each parts are meet requirement


2、Content confirm


① Instrument and meter test


Confirmation method:Check whether the instrument and meter installed in the system is calibrated, verify the validity of the certificate is within the validity period.


Acceptable standard:The instrument and meter installed in the system have been checked, certificate of conformity within the validity period.


Confirm result:Performance validation evaluation and advice according to performance evaluation form.


② No-load heat distribution


Confirmation method:The different in the oven position, put the thermometer, The temperature difference of different position in the oven is determined, and the heat distribution of the oven is checked.


Specific operation:Choice 16 road temperature inspection instrument, One of them put in the wind, the other put in the air outlet, A point placed on the device temperature probe position, The rest of the probes are evenly distributed in the center of the corresponding position of the oven. When the temperature reaches the set temperature, Read the thermometer temperature, And record the data, The three data of the statistics on the temperature distribution of the oven to make evaluation.


Acceptable standard:


1) Oven temperature can be controlled between℃, The difference between the average and the set value of the temperature in the oven≤±℃。


2) The difference between the maximum temperature and the minimum temperature is less than ℃


Confirm result:The results are recorded in the appendix 13.


③ Running validation conclusion:Run validation evaluation and recommendation see fill in operation confirmation evaluation form.


下一篇: Traditional Chinese medicine preparation equipment extraction
提示

请选择您要拨打的电话: